I-78 Facility Maintenance Improvements
PCM was engaged to provide cost estimates for the DRJTBC project, at four stages of design. Modernizing the vehicle maintenance and storage garage at the existing property to ensure that the current and future needs are met as well as various safety upgrades to the Toll Plaza and Welcome Center was the primary goal for this project. The project included the partial removal, renovation, and addition to a 19,450 sq. ft. maintenance garage facility. Additional work included façade and roof replacement of a Welcome Center and toll canopy, along with modifications and equipment installation at a salt dome. Specialty equipment included salt belt conveyor and hopper, brine maker and storage tanks and a pedestal mounted truck deicer. A new emergency generator was provided and fed from one building to the other, over 600′ away.